Building Permit Inspection Request

If you have a valid (active) permit, please enter the following information.


Permit Number *
(Example: C2012001234)

Type of Inspection

Inspection Code*                         OR
Inspection Type *
Date of Inspection * (Depending on availability, next day inspections may not be available)
Do you want to schedule another inspection type for this permit? No Yes


* = required

Did you know?

A home solar panel system consists of several solar panels, an inverter, a battery, a charge regulator, wiring, and support materials. Sunlight is absorbed by the solar panels and is converted to electricity by the installed system. The battery stores electricity that can be used at a later time, like cloudy days or during the evening.


Back to Top  up-arrow