Standard Water Plans

 

NO. Page Description Revision Date
N/A (1-72) WATER STANDARD SPECIFICATION 3/1/2019
600 (1-8) DESIGN CRITERIA 11/17/2016
600 (2 & 3-8) GENERAL NOTES 9/1/2013
600 (4-8) IMPROVEMENT PLAN REQUIREMENTS 9/1/2013
600 (5 & 6-8) ABBREVIATIONS 9/1/2013
600 (7-8) LEGEND 9/1/2013
600 (8-8) WATER PLAN REQUIREMENTS 9/1/2013
600 Appendix STATE LAW, WATER MAIN SEPARATION 7/1/2013
601   1” WATER SERVICE WITH 3/4 ” METER WITH AUTOMATIC METER READ (AMI) 11/17/2016
602   1” WATER SERVICE WITH 1” METER
WITH AUTOMATIC METER READ (AMI)
11/17/2016
602A   2” WATER SERVICE WITH 1” METER (AMI)
WITH AUTOMATIC METER READ (AMI)
11/17/2016
603   1“ OR 2” POSITIVE DISPLACEMENT
METER WITH 2” SERVICE  WITH AUTOMATIC METER READ (AMI)
11/17/2016
603A   1“ OR 2” COPPER WATER SERVICE INSTALLATION 11/17/2016
604A   3” COMPOUND METER WITH A 4” WATER SERVICE 3/1/2019
604B   4” COMPOUND METER WITH A 4” WATER SERVICE 3/1/2019
604C   6” COMPOUND METER WITH A 6” WATER SERVICE 3/1/2019
605A (1 & 2-2) 4” FIRE / DOMESTIC METER ASSEMBLY 9/1/2013
605B (1 & 2-2) 6” FIRE / DOMESTIC METER ASSEMBLY 10/1/2011
605C (1 & 2-2) 8” FIRE / DOMESTIC METER ASSEMBLY 10/1/2011
605D (1 & 2-2) 10” FIRE / DOMESTIC METER ASSEMBLY 10/1/2011
606A   TRENCH AND RESURFACING DETAIL-MINIMUM COVER 11/17/2016
606B   TRENCH AND RESURFACING DETAIL-LESS THAN MINIMUM COVER 11/17/2016
607   FIRE HYDRANT ASSEMBLY 11/17/2016
608   4” BLOW-OFF ASSEMBLY 9/1/2013
608A   SAMPLING CAN DETAIL 11/17/2016
609 pg 1 BACKFLOW STANDARD PLAN OVERVIEW 2/15/2017
609 pg 2 BACKFLOW PREVENTION NOTES 2/15/2017
609A   1” THROUGH 2” REDUCED PRESSURE PRINCIPLE BACKFLOW DEVICE 11/17/2016
609B   RESIDENTIAL FIRE AND DOMESTIC DCV 3/1/2019
609C   RESIDENTIAL FIRE AND DOMESTIC RPPD 3/1/2019
609D   3”-10” REDUCED PRESSURE PRINCIPLE DEVICE 11/17/2016
609E   AIRGAP BACKFLOW ASSEMBLY 11/17/2016
610 (1 of 2-2) BRIDGE & CULVERT CROSSING 9/1/2013
611   2” AIR & VACUUM RELEASE VALVE ASSEMBLY 12/01/2016
612   VALVE BOX ASSEMBLY 11/17/2016
612A   VALVE STEM EXTENSION 9/1/2013
612B   6",8", OR 12" CUT-IN VALVE 11/17/2016
613   METHOD FOR CUTTING & PLUGGING 9/1/2013
613A   WATER LINE CUT OUT (TEES & CROSSES) FOR 12 DIA MAIN AND SMALLER 9/1/2013
614   THRUST BLOCKS 9/1/2013
615   PIPE BARRICADE ASSEMBLY 9/1/2013
616   ADJUSTABLE PIPE SUPPORT DETAIL ASSEMBLY 9/1/2013
617     NOT USED  
618    2.5”-10” DOUBLE CHECK DETECTOR ASSEMBLY 11/17/2016
619   INSTALLING TAPPING SLEEVES AND VALVES HOT TAP ASSEMBLY 9/1/2013
620   STANDARD TAP OF STEEL MAIN 9/1/2013
621   INVERTED SIPHON ASSEMBLY 9/1/2013
621A   SIPHON ASSEMBLY  9/1/2013
622   STEEL CASING PIPE 9/1/2013
623   TAPPING STEEL PIPE 9/1/2013
624   UTILITY IN SLOPE DETAILS 9/1/2013
625   UTILITY BOX DETAILS 11/17/2016
625-629   NOT USED  
630   EXOTHERMIC WELD & BURIED JOINT BONDING DETAIL 10/1/2011
631   CATHODIC TEST STATION BOX #631
RUBBER GASKET JOINT BONDING DETAIL
10/1/2011
632   GATE VALVE BONDING & MAGNESIUM ANODES 10/1/2011
633   CABLE TRENCH & ZINC ANODE    10/1/2011
634   BURIED INSULATING FLANGE DETAIL AND TEST STATION 10/1/2011
635   SACRIFICIAL ANODE TEST STATION WIRING DIAGRAM 10/1/2011
636   CATHODIC PROTECTION FOR DUCTILE IRON FITTINGS 10/1/2011
637   CATHODIC PROTECTION FOR 6-12-INCH DUCTILE IRON PIPE WITH ANODE TEST STATION 10/1/2011
638   BURIED INSULATING FLANGE TEST STATION & TWO WIRE TEST STATION ASSEMBLY 10/1/2011





Did you know?


Solar energy has been used for over 2700 years. In 700 BC, glass lenses were used to make fire by magnifying the sun’s rays. Learn more about solar.

Contact Information

City of Huntington Beach
Public Works Department
2000 Main Street
Huntington Beach, CA
Phone: (714) 536-5431
Fax: (714) 374-1573
Email:  

Public Works Department Home
Ascon Landfill Information
Beach Maintenance
Bids
Major Projects
FAQs
Infrastructure Report
Public Works Commission
Purchasing
Standard Plans
Storm Information
Stormwater Quality
Trash & Recycling
Water Conservation
Wireless Communications
Back to Top  up-arrow